Tamsys Middle East > Storm Brake Systems for Port Cranes > Guided Rail Clamps (electric or hydraulic)
Guided Rail Clamps (Electric or Hydraulic)
Guided Rail Clamps (GRC ) are designed to clamp on
both sides of a rail. They are spring set and hydraulically OR electrically released.
The hydraulic cylinder is top mounted with no rod connections and can be easily removed for maintenance or replacement in minutes by undoing four bolts.
Adjustable Setting Time 2 - 30 sec
Holding Capacity 50 - 1000 kN
Min Paint Thickness200 - 275 µm
Benefits
Application
Benefits
- The hydraulic cylinder is top mounted with no rod connections and can be easily removed for maintenance or replacement in minutes by undoing four bolts.
- Uninterrupted braking even during a cylinder replacement
- No need for lubrication points for floating mechanism
- Robust levers made out of quality structural steel (not casted iron)
Application
- Ship to shore cranes
- Automated stacking cranes
- Shiploaders
- Stacker reclaimers
- Tripper cars